Portable Goal Posts      

 








To install this pole, dig a hole 450mm by 450mm by 600mm deep. Next, fill the hole with 5 bags of ready mixed concrete. Using the template, cast the foundation bolts into the concrete. After 3 days, stand the pole and securely bolt down.

Please note: Every different size pole has a different foundation size and things like wind and terrain have to be considered when specifying the correct foundation. Your complete foundation instructions will be supplied by Adda when you purchase your pole.



[ About Adda ] [ Flagpoles ] [ Installation Tips ] [ Current Installations ] [ Contact Us ] [ FAQ ] [ portable goal posts ] [Goalposts] [Be aware] [Rotating Banner Arms]